• it
    • en
    • ro

Costruzione albergo

Descrizione

Site: Hotel Construction

Drainage technique: Wellpoint systems installed under de mat foundation

Area: sqm. 2,500

Lowering of the groundwater level: mt.9, 50

Lithological type: Medium sands

No. of pumps or equipment used: 4

Client:

Category:

Skills used:

↑ Back To Top ↑