• en
    • it
    • ro

New hospital construction

Description

Site: New hospital construction

Drainage technique: Equipment for dewatering with wells in cls

Area: sqm. 25,000

Lowering of the groundwater level: mt.5, 50

Lithological type: Gravels and pebbles in the clay matrix

No. of pumps or equipment used: 28

Client:

Category:

Skills used:

↑ Back To Top ↑