• en
    • it
    • ro

Hotel Construction

Description

Site: Hotel Construction

Works: Wellpoint sistems for sands

Area: sqm. 2.500

Lowering of the groundwater level:: mt.9,50

Lithological type: Medium sands

No. of pumps or equipment used: 4

Client:

Category:

Skills used:

↑ Back To Top ↑